Extensions

House Extensions, Attic & Garage Conversions in Dublin and Leinster.

Extensions, attic and garage conversions — design, build and certify in one.

Open-plan ground floor rear extension with high ceilings and large rooflights

What it covers

House Extensions, Attic & Garage Conversions, run in-house by Marcin's team.

Extensions are where most clients first speak to us. The reasons vary — a growing family, an attic that has become storage by default rather than design, a 1970s side return that is too cold to use — but the question is always the same: how do we add space to a house that is otherwise lovely, and have it feel like it was always there?

We run extensions end to end. Where you have an architect, we build to their drawings and become the single point of accountability through planning, structural design and construction. Where you do not, we coordinate the architect and engineer ourselves and quote the build to a clear specification before work starts.

Attic conversions are one of our most common projects — adding a bedroom with ensuite to an Irish three-bed semi is one of the highest-value moves a client can make, and it is squarely within our scope. Garage conversions follow the same pattern: insulation, blockwork, plastering, electrics, plumbing and joinery, all run by one team.

Capabilities

  • Single and double-storey rear extensions
  • Side and wraparound extensions
  • Attic conversions (storage, bedroom, ensuite)
  • Garage conversions (utility, gym, home office)
  • New builds and one-off houses
  • Structural opening-up and steel works
  • Engineer and architect coordination
  • Planning and exemption advice

Materials & Spec

  • Cavity blockwork or timber frame
  • Insulated concrete form where specified
  • Glulam beams and structural steel
  • High-performance glazing and rooflights
  • External render, brick slip, cladding to match

Timeline

Garage conversions, 6 to 10 weeks. Attic conversions, 8 to 12 weeks. Single-storey extensions, 12 to 18 weeks. Double-storey, 16 to 24 weeks.

Pricing

Quoted by drawing and specification once design is settled. We give an indicative range at first site visit and a fixed quote once spec is locked.

Frequently Asked

Common questions about house extensions and attic conversions in Dublin.

Most rear extensions under 40 sqm fall under planning exemption, subject to conditions on height, height to eaves, and proximity to boundaries. We will tell you at first site visit whether your project is exempt or needs planning, and we coordinate the application if it does.

Most Dublin three-bed semi attic conversions run 8 to 12 weeks from the day the scaffold goes up. Adding an ensuite extends it slightly. We give a written schedule and update it weekly.

Yes. We routinely build to architects’ and engineers’ drawings as the main contractor. You get one point of accountability on site.

Yes — we coordinate the engineer and assigned certifier as part of the project so the certification is in place at completion.

Begin a Project

Ready to talk about your house extensions and attic conversions project?

Same-day replies on WhatsApp. Calls and emails answered within one working day.